How rooftop solar installation typically works in Jaipur: MNRE-empanelled vendors install Tier-1 mono-PERC panels (Waaree / Adani / Vikram) in 2-3 days, with 25-year linear performance warranty and 5-year inverter warranty. PM Solar (NGO) helps you understand the process and choose a vendor.

Typical rooftop solar installation timeline in Jaipur:

  1. Day 0 — Free awareness call with PM Solar (NGO) on WhatsApp / phone
  2. Day 1-2 — NGO counsellor explains subsidy eligibility, pricing references, and helps you shortlist MNRE-empanelled vendors from the official portal list
  3. Day 3 — You sign an agreement directly with the chosen MNRE-empanelled vendor; PM Surya Ghar + JVVNL applications are filed
  4. Day 7-10 — Panels + inverter delivered to site by the empanelled vendor
  5. Day 10-12 — Vendor performs mounting + panel + inverter installation (2-3 days work)
  6. Day 35-40 — JVVNL net-meter installed and system commissioned
  7. Day 65-80 — Subsidy credited to your bank account

Total: 6-8 weeks from first WhatsApp to subsidy in account.

Important: PM Solar (Solar Awareness Foundation) is an independent NGO. We do not install systems ourselves. All installation work is carried out by separately MNRE-empanelled vendors selected by the customer.

Pricing — After PM Surya Ghar Subsidy

2 kW
₹1,34,000
₹60,000 sub
₹74,000
EMI ₹1,536/mo
3 kW
₹1,96,000
₹78,000 sub
₹1,18,000
EMI ₹2,449/mo
5 kW
₹3,20,000
₹78,000 sub
₹2,42,000
EMI ₹5,024/mo

Our expert guides on this topic

MNRE-verified guidance and local Jaipur customer case studies

Frequently Asked Questions

Q.How many days does solar installation typically take in Jaipur?

2-3 days for the physical installation by an empanelled vendor; 6-8 weeks for the full process including subsidy credit.

The on-site installation work (mounting, panels, inverter, wiring) is typically carried out by an MNRE-empanelled vendor in 2-3 days for residential systems up to 5 kW. The full timeline from agreement to PM Surya Ghar subsidy in your bank account is 6-8 weeks (most of which is JVVNL net-meter approval + post-commissioning subsidy disbursement).

Q.What panel brands do MNRE-empanelled vendors typically use in Jaipur?

Tier-1 only: Waaree, Adani Solar, Vikram Solar mono-PERC panels.

MNRE-empanelled vendors in Jaipur typically supply Tier-1 mono-PERC panels — Waaree, Adani Solar and Vikram Solar — backed by a 25-year linear performance warranty (≥80% output at year 25) and a 12-year product warranty. Inverters: Tata Power Solar, Microtek, or Sungrow string inverters with 5-year warranty. PM Solar (NGO) can help you verify a vendor uses Tier-1 components before you sign the agreement.