VKI Area (Vishwakarma Industrial) · Pin 302013 Independent NGO · Awareness Platform

PM Surya Ghar Subsidy Guidance for VKI Area (Vishwakarma Industrial), Jaipur — Free NGO Support

VKI factories, MSME sheds and worker quarters can offset 60-90% of JVVNL commercial demand with 10-25 kW rooftop solar — 40% Y1 accelerated depreciation + GST input credit + net-metering.

68+
households guided
₹38,000
avg saving/mo
₹78k
max subsidy

VKI Area (Vishwakarma Industrial) Solar Pricing

Net cost after subsidy · EMI on 5 year / 9% pa

2 kW
₹1,34,000₹60,000 sub
₹74,000
EMI ₹1,536/mo
3 kW
₹1,96,000₹78,000 sub
₹1,18,000
EMI ₹2,449/mo
4 kW
₹2,58,000₹78,000 sub
₹1,80,000
EMI ₹3,737/mo
5 kW
₹3,20,000₹78,000 sub
₹2,42,000
EMI ₹5,024/mo
Calculate My Exact Savings
100% Free NGO · Active in VKI Area (Vishwakarma Industrial)1/3

Get your VKI Area (Vishwakarma Industrial) solar subsidy estimate in 2 mins

VKI factories, MSME sheds and worker quarters can offset 60-90% of JVVNL commercial demand with 10-25 kW rooftop solar — 40% Y1 accelerated depreciation + GST input credit + net-metering.

Step 1: Pincode + Bill

Last month JVVNL/BSES/Tata Power bill

2-min callback WhatsApp 80580-55990

Electricity Profile

₹25,000-₹2,50,000/month JVVNL LT/HT commercial bill, 2,500-25,000 units/month industrial load.

Rooftop Suitability

Asbestos / metal-sheet factory roofs (1,000-5,000 sq ft), worker-quarter RCC terraces 300-700 sq ft.

DISCOM

JVVNL (Jaipur Vidyut Vitran Nigam Ltd)

Net-metering up to 10 kW

We serve these areas in VKI Area (Vishwakarma Industrial)

VKI Road No. 1-22, RIICO Industrial Area, Vishwakarma Phase 1-3

VKI Road No. 14RIICO Office VishwakarmaRoad No. 22 CrossingSikar Road Bypass

VKI Area (Vishwakarma Industrial) Solar - Frequently Asked Questions

Can a VKI factory get PM Surya Ghar subsidy?

No — PM Surya Ghar Yojana is strictly residential. VKI factories run on JVVNL commercial (LT/HT) connections and are not eligible. However, commercial rooftop solar in VKI still pays back in 3.5-4.5 years via 40% Y1 accelerated depreciation + 18% GST input credit + net-metering. PM Solar (NGO) provides free CAPEX vs RESCO vs OPEX comparison for VKI MSMEs.

How much rooftop is needed for 25 kW solar in a VKI shed?

A 25 kW system needs ~2,200-2,500 sq ft of unshaded south-facing rooftop. Most VKI standard sheds (Road No. 14-22 corridor) have 3,000-5,000 sq ft of metal-sheet roof — plenty for 25-40 kW. Mounting on metal-sheet roofs uses non-penetrating ballast or L-foot brackets approved by JVVNL safety inspection.

What is the JVVNL commercial net-metering process for VKI?

For commercial connections up to 100 kW: (1) MNRE-empanelled vendor submits feasibility + load-flow study to JVVNL VKI sub-division, (2) Technical sanction in 21 days, (3) Installation + safety audit, (4) Bi-directional meter swap. End-to-end timeline: 45-75 days. Above 100 kW also needs RRECL approval. PM Solar (NGO) coordinates the paperwork free for VKI MSMEs.

Rooftop Solar Process in VKI Area (Vishwakarma Industrial) — 4 Steps

1

Free Guidance Call

NGO counsellor calls within 24h

2

Subsidy Application

Guidance on PM Surya Ghar + JVVNL filings

3

Install by empanelled vendor

MNRE-empanelled vendor installs Tier-1 panels in 2-3 days

4

Net-meter + Subsidy

Subsidy credited to your bank

Note: PM Solar (Solar Awareness Foundation) is an independent NGO. We provide awareness, eligibility and documentation guidance only. Installation is carried out separately by MNRE-empanelled vendors as per applicable government guidelines.

Free PM Surya Ghar Guidance for VKI Area (Vishwakarma Industrial)

Our NGO counsellor will guide you on eligibility, subsidy and choosing an MNRE-empanelled vendor within 24 hours — 100% free, zero obligation.

CallWhatsAppCheckCalculate