Independent NGO — not affiliated with the Government of India. Official portal: pmsuryaghar.gov.in
Verified: June 2026

Solar Subsidy in Jharkhand

Central PM Surya Ghar + additional state benefits. Total possible subsidy: Low-income 3 kW: Central ₹78,000 + State ₹45,000 = ₹1,23,000. Standard 3 kW: Central ₹78,000 only

Central Subsidy

₹30,000 - ₹78,000

PM Surya Ghar Yojana

State Subsidy

Low-income (< ₹3 lakh annual income): ₹15,000/kW for 1–3 kW · ₹10,000/kW for 3–10 kW (state cap, on top of central). Standard residents: only central PM Surya Ghar subsidy applies

Solar Potential

4.5-5.2 kWh/m²/day

Per day

Eligibility Criteria

  • Residential consumer of JBVNL with active connection
  • For state subsidy: annual household income certificate < ₹3 lakh
  • System size: 1 kW – 10 kW
  • Mandatory installation on plots > 500 sq yards (per state policy)
  • Installation by JREDA / MNRE-empanelled vendor
  • Apply via PM Surya Ghar portal + JREDA portal

Additional Benefits

  • Higher subsidies for low-income households
  • Exemption for solar structures (max 3m) from building height limits
  • Jharkhand Solar Policy 2022 valid until 2027
  • State targets 4,000 MW solar capacity

Net Metering Policy

Virtual net metering (VNM) and group VNM promoted for grid-connected systems. Gross metering with feed-in-tariff via PPA also available. JREDA handles implementation.

Capacity limit:

Up to 10 kW for residential

State Nodal Agency:

JREDA (Jharkhand Renewable Energy Development Agency)

Electricity DISCOMs

  • JBVNL
  • JUSNL

Key Cities

RanchiJamshedpurDhanbadBokaroHazaribaghDeoghar

Frequently Asked Questions

Does Jharkhand provide additional solar subsidy?+

Yes, for low-income households (annual income below ₹3 lakh), Jharkhand adds ₹15,000/kW for 1-3 kW and ₹10,000/kW for 3-10 kW on top of the central subsidy. Standard-income residents receive only the central PM Surya Ghar subsidy.

What is the net metering policy in Jharkhand?+

Jharkhand promotes virtual net metering (VNM) and group VNM for residential systems. Gross metering with feed-in-tariff via PPA also available through JREDA.

Sources & Verification

Every claim on this page is verified against the official sources below. Last verified: June 2026.

Disclaimer: PM Solar is an independent NGO, not a government body. For official applications and final subsidy amounts, please refer to the government portals linked above.

Considering solar in Jharkhand?

Check eligibility and get estimated savings in minutes.

Get Started

Information verified as of June 2026. Please confirm with JREDA (Jharkhand Renewable Energy Development Agency) and pmsuryaghar.gov.in before applying.

CallWhatsAppCheckCalculate