"10 kW + 1,200 units/month" — C-Scheme Premium Bungalow Solar Case Study

Three-storey C-Scheme heritage bungalow installs 10 kW rooftop solar, drops ₹14,500/month JVVNL bill to ₹680/month, and offsets 1,200+ units/month with JDA-approved heritage NOC.

PM Solar Customer Stories Desk 14 Feb 2026

The Singhvi household

Mr. Anil Singhvi, a senior advocate, owns a heritage 3-storey bungalow near Statue Circle, C-Scheme (pin 302001). The 5,200 sq ft built-up property houses a joint family of 7, runs 5 split ACs + 1 central, 2 EVs (Tata Nexon EV + Hyundai Kona), an outdoor pool circulation pump, and a home theatre.

The challenge

JVVNL bill: ₹13,800-₹14,500/month (consumption 1,400-1,550 units). C-Scheme heritage zone has strict JDA visibility rules — panels must not be visible from the main road.

The solution

After consulting PM Solar (Solar Awareness Foundation, NGO) on JDA heritage NOC and PM Surya Ghar eligibility, an MNRE-empanelled vendor designed a low-tilt 10 kW array on the rear-facing third-floor terrace (700 sq ft shadow-free), invisible from Bhagat Singh Marg. JDA NOC processed in 21 days.

Financials (indicative reference — largest residential package)

  • System size: 10 kW (20 × 540 W Waaree Bifacial + 10 kW Sungrow string inverter)
  • List price: ₹6,30,000
  • PM Surya Ghar subsidy: ₹78,000 (capped at 3 kW+)
  • Rajasthan RREC top-up: ₹17,000
  • Net cost: ₹5,35,000
  • 5-year EMI (SBI Solar Loan, 8.60% pa): ₹11,051/month
  • Down payment: ₹95,000

Before vs After (6 months post-commissioning)

MetricBefore solarAfter solar
Monthly JVVNL bill₹13,800-₹14,500₹560-₹780
Monthly generation01,200-1,350 units
Monthly EMI0₹11,051
Net outflow₹14,150₹11,721 (EMI + bill)
Monthly savings₹2,429

After year 5 (loan closure)

  • Monthly outflow drops to just ₹680 (fixed charge)
  • Annual savings: ₹1,62,000 for the next 20 years
  • 25-year lifetime savings: ₹38-42 lakh

JDA heritage NOC process — how to navigate it

For C-Scheme + Civil Lines heritage installations:

  1. Submit JDA NOC application with site photos + low-tilt mount design (your MNRE-empanelled vendor will prepare the technical drawing)
  2. JDA architect review (typically 14-21 days)
  3. Approval issued
  4. JVVNL net-meter application proceeds in parallel

PM Solar (Solar Awareness Foundation, NGO) provides free guidance on the JDA NOC documentation, vendor selection from the MNRE-empanelled list, and JVVNL paperwork. Installation itself is carried out by the MNRE-empanelled vendor selected by the customer.

> "We were told rooftop solar wasn't feasible on a heritage property in C-Scheme. After getting free guidance from PM Solar (NGO) on JDA heritage NOC and selecting an MNRE-empanelled vendor from the official list, within 6 weeks we had the JDA NOC, the JVVNL net-meter, and a fully commissioned 10 kW system that's invisible from the road." — Anil Singhvi, C-Scheme